Project Name & Location: Rehabilitation and Up-gradation of Aurangabad - Phulambri - Sillod  (Section-I) from existing km 0+000 to km 60+780 (Design km. 0+000 to km 60+400) to Four lane  with unpaved shoulders in the state of Maharashtra on Engineering Procurement & Construction (EPC) Basis Contract.

Project Details:

  • Project Length             : 48.13 Km.
  • No.of Pipe Culverts       : 55 Nos.
  • No.of Box Culverts        : 22 Nos.
  • Minor Bridges               : 19 Nos.
  • Major Bridges               :   4 Nos.
  • Length of Drain             : 24 Km
  • Length of Retaining Wall: 5.00 Km

Major Quantity Details:

  • Earth Work                    : 8,65,347 Cum
  • Granular Sub Base         : 1,45,470 Cum
  • Dry Lean Concrete(DLC) : 1,15,480 Cum
  • Pavement Quality 
  • Concrete (PQC)              : 2,05,054 Cum
  • Structures Concrete        :1,07,244 Cum


Value of Project:
396.62
Location
Aurangabad – Sillodrangabad
State
Maharashtra
Client
MoRT & H
Award Date
June 2017