Future City Road (FCR)

Project Overview
The project involves the construction of the Greenfield Radial Road – Phase I, stretching from Chainage 0+000 to 19+200, covering a total length of 19.20 km with a 100-meter Right of Way. It is designed as a 3+3 six-lane divided carriageway, with provisions for future expansion to 4+4 lanes. A 20-meter-wide central median is reserved for a potential future Metro or rail corridor. The project includes three-lane service roads on both sides, along with dedicated cycle tracks, footpaths, greenbelts, and utility corridors. To ensure seamless connectivity, the scope also involves the construction of viaducts, underpasses, and major bridges, ultimately enhancing regional connectivity between the Outer Ring Road (ORR) and the Regional Ring Road (RRR).
Major Quantities
Earth Work
42 Lakh Cum
Granular Sub-base
2,51,919 Cum
Wet Mix Macadam (WMM)
2,47,125 Cum
Bituminous Works
1,47,476 Cum
Concrete Works
4,08,896 Cum
RE Wall
3,47,631 Sqm
address
Kadiri, Ananthpur Dist, Andhara Pradesh
Key Details
Value of Project
INR 1332.70 Crores
Client
Hyderabad Growth Corridor Limited
Location
Hyderabad
State
Telangana
Project Award Date
November 2025
Appointed Date
December 2025
Expected Completion By
May 2028
Project Length
19.2 Kms
Mode of Project
BOQ