Widening of existing road to 4 lane with paved shoulder from Km 0/000 to Km 51/119 [existing chainage km 476/700 to km 523/530] (51.119 Km) of Tadipatri to Muddanur Bypass section of NH-67 in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22 on Engineering, Procurement & Construction (EPC) Mode.