Rithwik Projects Private Limited
HNSS Project-Phase II-Laying of CCLining to Kuppam Branch Canal fromKm 0.000 to Km 131.200 (Reach 1&2) in Palamanerand Kuppam constituencies
Scope of WorkCC Lining Works for Kuppam Branch Canal
Length of the Canal131.200KM
Excavation and removal of silt and silt mixed with sand75,900 Cum
Excavation in all kinds Soil including Ordinary Rock3,60,085 Cum
Gravel soil lining1,75,210 Cum
PQC10,700 Cum
RCC Kerb10,000 Rmt
Paver Blocks17,963 Sqm
Piling27,456 Rmt
Value of ProjectINR 169.80 Cr
ClientI & CAD Govt of Andhra Pradesh
LocationKuppam
StateAndhra Pradesh
Award DateFeb-25
Completion DateFeb-26
CC Lining Work11,05,877 Sqm
M10 Concrete Work for Foundations14,874 Cum
Shotcreating Work2,33,243 Sqm