Rithwik Projects Private Limited
Lot-1 for Diversion Channel, Coffer Dam, Dam, Spillway & Stilling Basin, Intake Structure, Desilling Chambers, SFT, HRT, Surge Shaft, Pressure Shaft, Surface Power House, TRC & other associated structures etc. of Rangit-IV HE Project, Sikkim.
Height of the Dam44 mtrs
Length of the Dam135.3 Mtrs
Type of DamConcrete Gravity Dam
Length & Dia of tunnel6.50 Kms / 7.1 Mtr
Power HouseSurface (3×40 MW)
Excavation3,60,000 Cum
Concrete1,40,000 Cum
Tunnel Excavation1,95,000 Cum
Tunnel Concrete1,22,200 Cum
Value of ProjectINR 452.12 Crores
ClientNHPC Limited
LocationJorthang
StateSikkim
Award Date23 September 2021
Completion DateAugust 2024