Aurangabad – Sillod setion of NH-753 (F): Section – I

Aurangabad – Sillod setion of NH-753 (F): Section – I

Rehabilitation and Upgradation of “Section-I, Aurangabad-Sillod from km. 0+000 to km. 60+630 (Design Chainage) of Aurangabad–Jalgaon Road NH-753F” to Two lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Basis
Project Details

Value of Project INR 396.62 Crores
Location Aurangabad
State Maharashtra
Client MoRT & H
Award Date June 2017
Expected completion by/th>

April 2023
Project Length 48.13 Km
No.of Pipe Culverts 55 Nos
No.of Box Culverts 22 Nos
Minor Bridges 19 Nos
Major Bridges 4 Nos
Length of Drain 24 Km
Length of Retaining Wall 5.00 Km

Major Quantity Details

Earth Work 8,65,347 Cum
Granular Sub Base 1,45,470 Cum
Dry Lean Concrete(DLC) 1,15,480 Cum
Pavement Quality Concrete (PQC) 2,05,054 Cum
Structures Concrete 1,07,244 Cum