The barrage is projected to have a storage capacity of approximately 54 M. cum (1.90 TMC), which will be used to provide water to five neighboring power stations. In addition, it will help conserve water and recharge the groundwater table, which will help meet the water supply needs of the adjacent villages that experience severe water shortages every summer.
Silent Features of Barrage :
Storage capacity proposed |
54 Mcum (1.90 TMC) |
Length of barrage |
867.5 M |
Crest level |
+209.500 M |
Pond Level |
+214.500 M |
Top level of barrage (Bridge level) |
+224.875 M |
Excavation quantity |
12 Lakhs Cum |
Concrete quantity |
2.4 Lakhs Cum |
Gates |
60 Nos – 12 x 5.3 M |
Value of Project |
INR 233.53 Crores |
Location |
Basanthpur Village, Near: Champa |
State |
Chhattisgarh |
Client |
Water Resources Division, Janjgir |
Award Date |
February 2011 |
Completion Date |
March 2018 |