Rehabilitation and Upgradation of “Section-II, Sillod – Fardapur, from Km. 60+630 to Km. 99+660 (Design Chainage) of Aurangabad–Jalgaon Road NH-753F” to Two lane with Paved Shoulder Configuration in the State
RTPP – Stage – IV – Unit – 6 (1 x 600 MW) Balance of Plant Package Value of Project INR 340 Crores Location Kadapa District State Andhra Pradesh Client
Construction of Barrage and Desilting Chamber (Balance works) Package for Tapovan Vishnugad Hydro Electric Power Project (4X130 MW) on the River Dhauliganga in Uttaranchal. Value of Project INR 437.56 Crores
EPC Contract Package covering Design & Engineering Services, Civil and Hydro- Mechanical Works of Dhaulasidh HEP (66 MW). Value of Project INR 526.92 Crores Location Kangra, Hamirpur Dist State Himachal
Koteshwar HEP (4×100 MW), is about 22 km downstream of Tehri Dam, is an integral part of Tehri Hydro Power Complex (2400 MW). It consists of a 97.5m high concrete
Scheme JNNSM Phase-1, Batch-1 Installed Capacity 5.116 MW, 21528 PV Modules (Multi Crystalline Solar Photo Voltaic Modules) Total Area 45.53 Acres Effective Energy Generation KWh/KWp/year – Max9.198 Million Units/Year Power
Vented Dam: Vented Dam constructed across Nethravathi River near Thumbe. The site is located about 20 Km away from Mangalore. Objective of Vented Dam: An old anicut has storage facilities
The barrage is projected to have a storage capacity of approximately 54 M. cum (1.90 TMC), which will be used to provide water to five neighboring power stations. In addition,
Rehabilitation and Improvements to Sholayar Dam in Valparai Taluk of Coimbatore District under DRIP Phase II (Civil Works) – Package -I Value of Project INR 91.49 Crores Location Valparai Taluk